{"id":933,"date":"2008-03-15T16:25:47","date_gmt":"2008-03-15T16:25:47","guid":{"rendered":"https:\/\/svapm.org\/2008\/03\/15\/it-was-an-itsy-bitsy-teeny-weeny\/"},"modified":"2019-08-07T14:35:40","modified_gmt":"2019-08-07T21:35:40","slug":"it-was-an-itsy-bitsy-teeny-weeny","status":"publish","type":"post","link":"https:\/\/svapm.org\/?p=933","title":{"rendered":"It Was An Itsy Bitsy, Teeny Weeny&#8230;&#8230;"},"content":{"rendered":"<p>Finding the right balance of documentation and methodology can be challenging on small projects.  Here are some guidelines I use when managing smaller projects.<\/p>\n<p>I have been managing small projects for some time now. Some of my project are really tiny, I&#8217;m talking about 8 hours of work max. Others can be 2 week or month-long projects. Some span several months, and then you get up into the 6 month and year plus undertakings.<\/p>\n<p>As a student of project management, I have often struggled with finding the right level of planning and documentation for these various sizes of projects. Some things are obvious, as in I&#8217;m not going to go through a formal project plan and communication plan, etc. for an 8 hour project.<\/p>\n<p>As a rough guideline, here is what I use:<\/p>\n<p><!--more--><br \/>\n<strong>Level 1 (Projects longer than 6 months in duration)<\/strong><br \/>\n-Full blown project planning and documentation for whatever is appropriate to the project<\/p>\n<p><strong>Level 2 (Projects 1-6 months in duration)<\/strong><br \/>\n-Simplified project planning document, which includes brief communications and risk plans, along with scope definition, limitations, objectives, and deliverables. Also containts a simple WBS and Gantt-style task list with dependencies, owners, estimates, and a timeline.<br \/>\n-Weekly status reports to stakeholders<br \/>\n-Project meeting agenda\/minutes template &#8211; I use this to document the agenda before meetings about the project, then update it immediately after the meetings and send it out to all the stakeholders. It includes a section for decisions regarding agenda items, and a seperate section for action items.<\/p>\n<p>-Project Closure report at the end which summarizes the business benefits gained and effort spent. This is a good post-mortem look at ROI. Lessons learned are also attached to this.<\/p>\n<p><strong>Level 3 (Projects 1 to 4 weeks in duration)<\/strong><br \/>\n-Simple project request form, where the requestor fills out their definition of requirements and business justification. Since these requests are fairly simple, I normally work out the details of the requirements over the phone with the customer, and just make updates in my project documentation log (which I keep for all projects big and small)<br \/>\n-Weekly status reports to all stakeholders (sometimes yes, sometimes no &#8211; depends on the project)<\/p>\n<p>-Project Closure Report<\/p>\n<p><strong>Level 4 (Less than 1 week)<\/strong><br \/>\n-For this I still have the simple project request form<br \/>\n-Email when the deliverable (usually 1) is ready for validation, asking for approval<\/p>\n<p>I keep detailed activity logs for all levels of projects, even if it&#8217;s a 2 hour job. My department has a sharepoint site set up that works really slick for this.<\/p>\n<p>I find that using these guidelines, and the templates I&#8217;ve developed, really makes it easy for me to keep my ducks in a row and keep my stakeholders informed about what is going on, for any small to medium project I am managing. For more information, check out <a title=\"Managing Small Projects\" href=\"http:\/\/hosteddocs.ittoolbox.com\/SB10306smallprj.pdf\">this great article<\/a> by Simon Buehring which I found today and very closely matches my style for managing small projects.<\/p>\n<p><em><\/em><\/p>\n<p><em>About the author<br \/>\n<\/em><\/p>\n<hr \/>\n<p><em><a target=\"_blank\" href=\"http:\/\/www.linkedin.com\/in\/joshnankivel\" rel=\"noopener noreferrer\"><img decoding=\"async\" align=\"right\" alt=\"JoshNankivel\" title=\"JoshNankivel\" id=\"image1118\" src=\"https:\/\/svapm.org\/wp-content\/uploads\/2008\/07\/joshnankivel.thumbnail.jpg\" \/><\/a> <a target=\"_blank\" href=\"http:\/\/pmStudent.com\" rel=\"noopener noreferrer\">Josh Nankivel<\/a> is a Project Planning &#038; Controls Control Account Manager and contractor for the ground system of the <a target=\"_blank\" href=\"http:\/\/ldcm.nasa.gov\/about.html\" rel=\"noopener noreferrer\">Landsat Data Continuity Mission<\/a>, a joint project between the <a target=\"_blank\" href=\"http:\/\/landsat.usgs.gov\/\" rel=\"noopener noreferrer\">USGS<\/a> and <a target=\"_blank\" href=\"http:\/\/ldcm.nasa.gov\/about.html\" rel=\"noopener noreferrer\">NASA<\/a>. His academic background includes a BS in Project Management, summa cum laude.\u00a0 He can be found writing and contributing in many places within the project management community, and his primary project management website is located at <a href=\"http:\/\/www.pmstudent.com\/\">pmstudent.com<\/a>. <\/em><em><\/em><em><\/em> <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Finding the right balance of documentation and methodology can be challenging on small projects. Here are some guidelines I use [&hellip;]<\/p>\n","protected":false},"author":116,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"give_campaign_id":0,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[2],"tags":[],"class_list":["post-933","post","type-post","status-publish","format-standard","hentry","category-leadership"],"aioseo_notices":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts\/933","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/users\/116"}],"replies":[{"embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=933"}],"version-history":[{"count":1,"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts\/933\/revisions"}],"predecessor-version":[{"id":13959,"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts\/933\/revisions\/13959"}],"wp:attachment":[{"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=933"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=933"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=933"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}