{"id":7311,"date":"2012-01-03T16:21:56","date_gmt":"2012-01-03T23:21:56","guid":{"rendered":"https:\/\/svapm.org\/?p=7311"},"modified":"2011-09-05T07:44:39","modified_gmt":"2011-09-05T14:44:39","slug":"handling-the-speed-bumps-in-a-project-schedule","status":"publish","type":"post","link":"https:\/\/svapm.org\/?p=7311","title":{"rendered":"Handling the speed-bumps in a project schedule (Part I)"},"content":{"rendered":"<p>Corporate Exit Strategist for the blooming entrepreneur and business coach.<\/p>\n<p><a href=\"https:\/\/svapm.org\/handling-the-speed-bumps-in-a-project-schedule\/speedbump2\" rel=\"attachment wp-att-7313\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-7313\" src=\"https:\/\/svapm.org\/wp-content\/uploads\/2012\/01\/speedbump2.jpg\" alt=\"\" width=\"75\" height=\"100\" \/><\/a>Last week I was taping a series of lectures for the Sequel Server World Wide User Group (SSWUG.org), and I was asked \u201chow does a project manager handle items that causes us to miss deadlines?\u201d<\/p>\n<p>This is an interesting question, because every project will have speed bumps.\u00a0 A good project manager expects speed-bumps and actually plans for the unexpected.\u00a0 So \u2013 how does one do this intelligently to synchronize with the final delivery dates?<\/p>\n<p>There are several tools in the good project manager\u2019s arsenal:<\/p>\n<ol>\n<li>Acknowledging the natural ebb and flow of a project<\/li>\n<li>Recovery Protocol<\/li>\n<li>Critical Path Analysis<\/li>\n<\/ol>\n<p>The next three articles will cover some high-level points of the above:<\/p>\n<p><strong>Acknowledging the natural ebb and flows:<\/strong><\/p>\n<p>Acknowledging the natural ebb and flows, the peaks and valleys, and the seasons of every endeavor is the first step.\u00a0 \u00a0Since every project in the past has had problems or issues that have temporarily derailed the plan, there is no reason to believe that your next project won\u2019t have something unexpected occur.\u00a0 This recognition is a power tool.\u00a0 If you can recognize and acknowledge this, you can plan and manage.<\/p>\n<p>Some examples:<\/p>\n<p style=\"padding-left: 30px\"><em>The development team on Project A is hitting a road block. \u00a0Although the development team is doing everything they can do resolve the issue, the test team is waiting on code to test and the documentation team has nothing to write about.\u00a0 Others developers are waiting for this feature or code library to continue their work.\u00a0 And as everyone is waiting, the project time clock is still ticking. \u00a0How does the project manager stay on schedule?<\/em><\/p>\n<p>The good project manager will have a recovery plan already in mind.\u00a0 He will move some isolated \u201clater\u201d scheduled items up on the schedule.\u00a0\u00a0 He plays around with time.\u00a0 For instance:<\/p>\n<ol>\n<li>Even though there isn\u2019t any code to test, the testers can be building the system test lab.\u00a0 Although that was a later task, it is isolated and can be moved up,\u00a0 to save time at the end.<\/li>\n<li>Developers not working on the problem, can be working on the backlog of defects.\u00a0 There are always lower severity level defects that need to be corrected.\u00a0 Many severity 3 and 4 defects (even though they are lower severity) have an affect on usability and therefore impact on the clients&#8217; perception of quality.\u00a0 Fixing these level defects early in the development cycle will improve the perceived usability of the product.<\/li>\n<li>\u00a0The testers can be assisting developers with their unit testing on the backlog of defects.<\/li>\n<li>\u00a0Documentation team can be writing user case test scenarios, which can later be used in their User Manuals.<\/li>\n<li>\u00a0Testers can assist with the test-driven development features.<\/li>\n<li>Tech writers can assist with writing more accurate and instructional error messages and dialogues.<\/li>\n<\/ol>\n<p><strong>Conclusion:<\/strong><br \/>\nA good project manager doesn\u2019t try to control a project.\u00a0 A good project manager adapts and manages the natural flow of things.\u00a0 The trick isn\u2019t to stay on track. \u00a0That is pretty much an impossible request.\u00a0 \u00a0The skill is to seamlessly get back on track when we wax and wane.<\/p>\n<p>The next feature will cover the idea of a recovery protocol chart.<\/p>\n","protected":false},"excerpt":{"rendered":"<p> Last week I was taping a series of lectures for the Sequel Server World Wide User Group (SSWUG.org), and I was asked \u201chow does a project manager handle items that causes us to miss deadlines?\u201d <\/p>\n<p>This is an interesting question, because every project will have speed bumps.  A good project manager expects speed-bumps and actually plans for the unexpected.  So \u2013 how does one do this intelligently to synchronize with the final delivery dates?<\/p>\n","protected":false},"author":1508,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"give_campaign_id":0,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[2,5,20,6,1,854,855,856,847,848,849],"tags":[39,33,64,167,1370,17,38],"class_list":["post-7311","post","type-post","status-publish","format-standard","hentry","category-leadership","category-time-management","category-quality","category-communications","category-miscellaneous","category-pmbok-process-planning","category-pmbok-process-executing","category-pmbok-process-monitoring-and-controlling","category-self-leadership","category-1-1-leadership","category-team-leadership","tag-best-practices","tag-common-sense","tag-communication","tag-continuous-improvement","tag-leadership","tag-lessons-learned","tag-project-management"],"aioseo_notices":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts\/7311","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/users\/1508"}],"replies":[{"embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7311"}],"version-history":[{"count":0,"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts\/7311\/revisions"}],"wp:attachment":[{"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7311"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7311"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7311"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}