{"id":581,"date":"2011-01-17T12:09:11","date_gmt":"2011-01-17T19:09:11","guid":{"rendered":"https:\/\/svapm.org\/?p=581"},"modified":"2011-01-17T12:09:11","modified_gmt":"2011-01-17T19:09:11","slug":"idea-1-in-agile","status":"publish","type":"post","link":"https:\/\/svapm.org\/?p=581","title":{"rendered":"Idea #1 in Agile"},"content":{"rendered":"<p><span style=\"font-size: 11.6667px\">Agile isn&#8217;t about producing products faster than other methods. Agile isn&#8217;t about working faster than other people. <\/span><\/p>\n<div>\n<p><strong><em>The single most fundamental concept in &#8220;agile&#8221; is the\u00a0speed of feedback<\/em><\/strong>.<\/p>\n<p>There are at least 2 very important sources of feedback that can be leveraged in this way.<!--more--><\/p>\n<p>One  is the work accomplished to date, seeking confirmation and reaction  from its potential customers \/ users \/ buyers. Users&#8217; experiences with a  product can provoke appropriately creative new ways to extend that  product, or product concept. These are ideas that weren&#8217;t stimulated  into existence PRIOR to an interaction with that product. Action  sequences can be reorganized, refactored, based on mockups, prototypes,  and indeed, even complete iterations on infrastructure and end-to-end  use cases or user stories, as the work takes shape. This is appropriate  and ought to be leveraged by teams with good work practices &#8211; why let  good ideas go to waste just because they weren&#8217;t in the &#8220;signed off  spec&#8221;?<\/p>\n<p>Another  is life itself.\u00a0What can break other execution models and methods is  that in the time it takes to perform a a plan, or even just a single  stage of a plan (be it specification, elaboration, design, coding,  etc.), the world can change in the time it takes to perform that stage.  Big plans have big components of the plan, typically. These stages take  time to perform. If during this time, the world (read: customer needs,  business ecosystem, market conditions, world events, available  technologies&#8230;) changes, then there is little opportunity to reflect  these changes, except via laborious and high-overhead (speed-killing)  &#8220;change control boards&#8221;.\u00a0So  viewed this way, you can see that complex plans that involve months of  execution, where planning is done in detail up front, historically  haven&#8217;t accommodated the &#8220;life changes&#8221; reality of &#8220;s*** happens&#8221;. If  you cannot adapt a plan to the reality of business, as it happens, then  you operate in another world than the one you&#8217;re trying to execute in.<\/p>\n<p><strong>Corollaries<\/strong><\/p>\n<p>1.  You don&#8217;t have to consider or adopt agile if your world isn&#8217;t likely to  change much (id est, the ways you plan and execute aren&#8217;t going to be  changed much by days that pass by). Perhaps the construction industry is  like this. Perhaps flower shops, or dental offices. (In our business,  maybe accounting software&#8230;?)<\/p>\n<p>2.  You don&#8217;t have to consider or adopt agile if your user customers&#8217;  experiences with your product isn&#8217;t like to change, and you are quite  familiar with those experience modes and patterns, and can predict<\/p>\n<p>3.  If your world *does* change&#8230; as in plans could be affected by world  events, details that are only realized as prototypes become available,  then what in your current methodology allows you to adapt to such  change? Is it that you can reneg on commitments? Is it that your  colleagues and\/or customers are just really &#8220;reasonable&#8221; and tolerant?  or do you need something more explicitly aware that such change is not  just possible, but likely?<\/p>\n<p><strong>The Take-Away<\/strong><\/p>\n<p>Inertial guidance systems that controlled expensive long-range  missiles gave way to real-time dynamic control systems that could  course-correct on the way to a target. Point, shoot, and  hope-for-the-best was fine when that&#8217;s all that was available. With  expensive business weapons like teams of software  engineers and architects would your business trust a point, shoot and  hope-for-the-best method of execution, if real-time dynamic course-correcting methods are available?<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Agile isn&#8217;t about producing products faster than other methods. Agile isn&#8217;t about working faster than other people. The single most [&hellip;]<\/p>\n","protected":false},"author":132,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"give_campaign_id":0,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[9,854,855,856,849,850],"tags":[],"class_list":["post-581","post","type-post","status-publish","format-standard","hentry","category-risk-management","category-pmbok-process-planning","category-pmbok-process-executing","category-pmbok-process-monitoring-and-controlling","category-team-leadership","category-organizational-leadership"],"aioseo_notices":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts\/581","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/users\/132"}],"replies":[{"embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=581"}],"version-history":[{"count":0,"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts\/581\/revisions"}],"wp:attachment":[{"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=581"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=581"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=581"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}