{"id":4921,"date":"2010-09-03T07:00:09","date_gmt":"2010-09-03T14:00:09","guid":{"rendered":"https:\/\/svapm.org\/?p=4921"},"modified":"2010-08-29T08:59:11","modified_gmt":"2010-08-29T15:59:11","slug":"green-project-management-and-the-bp-deepwater-horizon-spill-pt-3","status":"publish","type":"post","link":"https:\/\/svapm.org\/?p=4921","title":{"rendered":"Green Project Management and the BP Deepwater Horizon Spill(3\/3)"},"content":{"rendered":"<p><a href=\"https:\/\/svapm.org\/wp-content\/uploads\/Deepwater.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-4912\" title=\"Deepwater\" src=\"https:\/\/svapm.org\/wp-content\/uploads\/Deepwater.jpg\" alt=\"\" width=\"300\" height=\"226\" \/><\/a><span style=\"color: #c0c0c0;\"><em>A joint post from EarthPM and TenStep:<\/em><\/span><br \/>\nLast time we introduced this series and outlined the focus for the topic of green project management using the Deepwater Horizon disaster as motivation. In this post, we&#8217;ll cover how we&#8217;d work &#8216;green&#8217; project considerations into the Project Charter, Project Scope Management, Project Integration Management, Project Management Plan, Requirements Management. In this last of three parts, we&#8217;ll cover Cost Management, Communication Management, Risk Management and Procurement Management and give a brief summary.<\/p>\n<h2>Cost Management<\/h2>\n<p>When estimating project costs, did BP consider costs for implementing any risk response strategies?<\/p>\n<p>As mentioned in the Charter section, one could look at the Kevin Costner-funded <a href=\"http:\/\/www.theicpm.com\/%5C\">Ocean<\/a> Therapy centrifuge boats as an example.  For a relatively small  investment, BP would be buying not only an easy way to clean up after a  possible spill, but would gain valuable positive PR by aligning with the  high-profile actor and his efforts to protect the Gulf. Perhaps it is  too optimistic to think that the oil companies would have identified oil  cleanup technology as a part of risk-response, but it certainly is  within the realm of reason that cleanup technology and costs would be  included in risk contingency plans (the plans that are put into effect  if the original risk plan fails).<\/p>\n<p>In fact, a recent news story shows that \u2013 although late \u2013 the oil  industry has pooled their resources and is collaborating on oil spill  response.  <a href=\"http:\/\/www.theicpm.com\/%5C\">See this Reuters news story<\/a>.<\/p>\n<p>Identifying the costs related to the project\\\u2019s environmental aspects  allows the project manager to discuss the costs with the Sponsor and  determine whether the cost is more than offset by the project results.  The financial costs of the realized threat are so high in this case \u2013 in  the tens of billions of dollars and in fact the continued life of the  company itself \u2013 that a different type of thinking has to be applied.   As is obvious now, BP could have invested more upfront to further  mitigate or avoid the risk of spilling oil into the ocean. Even with  Green Project Management, if BP\\\u2019s decision was not to invest more in a  risk response strategy, then perhaps they should have estimated the  contingent costs required for a clean-up activity as they are currently  undertaking. <em>See the risk management section.<\/em><\/p>\n<h2>Communication Management \u2013 Identify Stakeholders<\/h2>\n<p>How thorough was the stakeholder plan and ultimately the  Communication Plan prepared by BP for this project? This project appears  to have many key stakeholder groups, both internal and external. Was  every major stakeholder group \u2013 internal BP, NGOs, government,  industries\/associations (e.g., fishing along the Gulf Coast), etc \u2013  identified and considered? Were they all included in the communications  as BP developed and implemented the oil rig?<\/p>\n<p>What type of communications plan would allow BP Chairman Carl-Henric  Svanberg to say \u201cwe care about the small people.\\\u201d?  We assert that with  properly indentified stakeholders and a thoughtful stakeholder  management plan, this likely would not have happened.<\/p>\n<h2>Risk Management \u2013 Probability and Impact Assessment<\/h2>\n<p>Really, this entire incident comes down to the way BP and others  managed project risk.  The context is greater than risk management, as  you can tell by the number of other headers in this document.  But it  really comes down to project risk management. With \u201cgreenthink\u201d, risks  may be evaluated differently.<\/p>\n<p>If we consider environmental factors that had never been applied,  then BP may have identified the risk of the blowout as an extremely low  probability of occurrence (based on prior experience, faith in the  blowout preventer, competitors\\\u2019 experience, etc) but a very high impact  when considering the environmental impact.  In fact, a very similar  accident occurred in 1979 the <a href=\"http:\/\/www.theicpm.com\/%5C\">Ixtoc<\/a>.   In that case, the blowout preventer also failed.  So there was a  precedent for this type of failure.  It could not be considered a  \u201cfailsafe\u201d solution.  The assessment could have also included the  environmental impact of a blowout that occurred in Santa Barbara,  California, in 1969.  Was their assessment of the impact high enough?<\/p>\n<p>With such a low probability, you would have to have a huge impact for  the product of probability and impact to give a risk score worth  pursuing.  We assert that the probability was considered to be zero and  that the impact was tremendously undervalued.  Without considering the  environment aspect in project management process of risk management, the  product was low enough that the risk mitigation and response was  inadequate. As we noted above, Green Project Management may not result  in a different decision. However, we are discussing this event because  it truly depicts the importance of considering the environment and  making sure that all project-related risks are properly identified,  quantified, and addressed with the Sponsor and key stakeholders.<\/p>\n<h2>Procurement Management<\/h2>\n<p>When planning and executing procurement activities for this project, did BP:<\/p>\n<ul>\n<li>Validate      that their vendors\/partners (such as Halliburton) met <em>their<\/em> environmental requirements?<\/li>\n<li>Understand      how their vendors\/partners would align to BP\\\u2019s environmental      policies and project approach?<\/li>\n<li>Request      feedback from vendors\/partners on how they would align with environmental      policies?<\/li>\n<li>Audit      that the vendors\/partners were actually following the environmental      policies?<\/li>\n<li>Audit      that the deliverables met the defined environmental criteria?<\/li>\n<\/ul>\n<h2>Summary<\/h2>\n<p>These examples have been provided to demonstrate how Green Project  Management could assist in incorporating environmental thinking in any  project. These scratch the surface in factoring the environment into  project management processes. Perhaps BP accomplished these and more.  Then again, perhaps a more structured approach to including the  environment in all project management processes would have uncovered  some of the issues and led to some very different decisions during the  project, prior to deciding to drill more than five thousand feet deep in  the Gulf of Mexico.<\/p>\n<p>We assert that the point of Green Project Management is to view  projects through an \u201cenvironmental lens\u201d. Perhaps, if that happened,  some decisions would be made differently, with very different results.<\/p>\n<p>About the Authors<\/p>\n<p><em>TenStep, Inc, focuses on methodology development, training, and  consulting, through its worldwide network of offices. Its focus on green  project management (<\/em><a href=\"http:\/\/www.theicpm.com\/%5C\"><em>www.green-pm.com<\/em><\/a><em>) was pioneered by Tom Mochal and Andrea Krasnoff. <\/em><\/p>\n<p><em>Tom Mochal, PMP is President of TenStep, Inc., (<\/em><a title=\"\\\" href=\"http:\/\/www.theicpm.com\/%5C\"><em>www.TenStep.com<\/em><\/a><em>).  Mochal is an expert instructor and consultant on project management,  project management offices, development lifecycle, portfolio management,  application support, people management and other related areas. He was  awarded 2005 Distinguished Contribution Award from the Project  Management Institute (PMI). <\/em><\/p>\n<p><em>Andrea Krasnoff, PMP is Director of TenStep Consulting Services.  Andrea has more than 20 years experience in project management, program  management, portfolio management, and PMOs. She is the Director of  TenStep Consulting Services and is a key contributor to the TenStep  Green-PM model. <\/em><\/p>\n<p><em>EarthPM is dedicated to the \u201cintersection of green and project  management and is a collaboration between Rich Maltzman and Dave  Shirley, co-authors of <\/em><a href=\"http:\/\/www.theicpm.com\/%5C\"><em>Green Project Management<\/em><\/a><em>,  CRC Press.  EarthPM provides the critical link between project  management and environmentalism to increase awareness amongst project  managers of the power they have to improve the greenality and  effectiveness of their projects \u2013 whether or not they are directly  involved with the environment.  Through their website <\/em><a href=\"http:\/\/www.theicpm.com\/%5C\">EarthPM.com<\/a>,<em> Rich and Dave provide a variety of blog postings <\/em><a href=\"http:\/\/www.theicpm.com\/%5C\"><em>and<\/em><\/a><em> resources, as well as consulting and course development services in Project Management and Green Project Management. <\/em><\/p>\n<p><em>Rich Maltzman, MSIE, PMP, has more than 30 years of project  management experience managing projects, leading project managers,  consulting and teaching in Europe, the Middle East and the United  States.  Currently, Rich is Senior Manager, Learning and Professional  Advancement, at the Global Program Management Office of a major telecom  concern. He is currently co-authoring a book with Ranjit Biswas, PMP,  entitled \u201cThe Fiddler on the Project\u201d, and posts regularly on his blog,  Scope Cr\u00eape, <\/em><a title=\"\\\" href=\"http:\/\/www.theicpm.com\/%5C\" target=\"\\\"><em><\/em><em> <\/em><\/a><em><\/em><em><a href=\"http:\/\/scopecrepe.blogspot.com\/\">http:\/\/scopecrepe.blogspot.com<\/a><\/em><em>.<\/em><\/p>\n<p><em>Dave Shirley, MBA, PMP, has more than 30 years of project  management experience in environmental and public health, and the  telecommunications industry leading projects, project teams, managing  project managers, consulting, teaching and course development.  He is  currently developing a graduate course in Environmental Issues.  Dave is  currently writing a book on project management for health care  professionals. <\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A joint post from EarthPM and TenStep: Last time we introduced this series and outlined the focus for the topic [&hellip;]<\/p>\n","protected":false},"author":803,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"give_campaign_id":0,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[2,19,6,9],"tags":[831,832,833,834,835,836,837,1375,838,839,840,841,842],"class_list":["post-4921","post","type-post","status-publish","format-standard","hentry","category-leadership","category-global","category-communications","category-risk-management","tag-deepwater-horizon","tag-emp","tag-environmental-management-plan","tag-environmental-management-policy","tag-environmental-policies","tag-environmental-risk-management-plan","tag-environmental-risk-plan","tag-risk-management","tag-risk-averse","tag-risk-management-plan","tag-risk-plan","tag-risk-reaction","tag-sustainability"],"aioseo_notices":[],"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts\/4921","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/users\/803"}],"replies":[{"embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4921"}],"version-history":[{"count":0,"href":"https:\/\/svapm.org\/index.php?rest_route=\/wp\/v2\/posts\/4921\/revisions"}],"wp:attachment":[{"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4921"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4921"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/svapm.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}